MIB Structural Homes provides a fast track, cost effective, environmentally friendly construction process which has been extensively used worldwide for over 20 years.

Exterior view of an MIB Structural Home

  1. The structural envelope of a home can be built from the slab to weather tight building in under 8 days.
  2. The complete installation of the MIB Structural home is an 8 day process as compared to up to an 8 week blockwork process just for the walls.

    The MIB Structural Home is not weather dependant on installation and does not need the external skin to be built at the same time.
  3. MIB Structural Homes Panel has a u-value of 0.4. U value W/m2K Which goes part way to current part L regs of 0.25 U value W/m2K with the addition of the facade insulation code 3, 4 and beyond ratings are easily achieved.
  4. When compared to blockwork, the MIB Structural Homes Panel structure uses:
    • 10% of water
    • 1 lorry load compared to 8 lorries of blocks and insulation with corresponding safety and environmental benefits to local area
    • Zero ozone depleting insulation with a Global Warming Potential of 4.08
    • Has 27% embodied energy
    • Requires no waste removal, reducing landfill
    • Manufactured off site with simple dry fixing on site
MIB Structural Homes can construct a 3 bedroom, 90m2 house for under £50,000! Click here for more information on this incredible offer.