A three quarter reduction in the programme period has been achieved on a Balfour Beatty hospital contract through the use of pre-formed panels. The panels have produced a cost saving of 25% for Balfour Beatty, compared with the use of using brick and blockwork, on top of thousands of pounds of savings on preliminaries achieved through reduction in time.